Possession Snagging: Pest-Related Items to Add to Your Snag List
When you take possession of a new home, a snag list records defects for the builder to fix. Pest-related items are often missed.
Add these to yours.
The short answer
On snagging, check gaps around pipes and windows, wood fittings and frames, signs of damp and leaks, floor traps and drain covers, sealing around kitchen and bathroom fittings, balcony drainage, and any evidence of termite treatment documentation. Photograph every issue and get it recorded in writing.
Add to your snag list
- Unsealed gaps around pipes, cables and windows.
- Damp patches or leaks.
- Missing floor-trap covers and open drains.
- Wood door frames and cabinets with any hole, tube or powder.
- Gaps between cabinets and walls.
- Balcony drainage and standing water.
- Missing anti-termite treatment papers.
Tips
- Inspect in daylight with a torch.
- Photograph and date each item.
- Ask for a reasonable fix date.
- Re-inspect after repairs.
Why it matters
Gaps and damp that look minor at handover often become pest entry points. It is easier to fix them before you move in.
When to call a professional
If the problem is widespread, keeps returning or you are unsure what you are dealing with, a professional inspection will save time and avoid wasted effort.
Frequently asked questions
Is the builder responsible?
Often, within the defect period. Check your agreement.
Should I hire an inspector?
It can help, particularly for wood and damp.
Do I need termite papers?
Ask for any treatment records.
What if they refuse?
Document in writing and seek advice.
This guide is part of IPest's complete resource on pest control. For identification help, prevention and treatment options, see our full pest control guide for Bangalore.
Book Pest Inspection
Our team will contact you within 30 minutes
Thank you! We'll call you shortly.
For urgent help, call +91 7411032320